The MEP Engineering Journal · Technical Paper

Ventilation Design for Vertical and Underground Routes

HVACIntermediate2026-11-10

Abstract

A practical workflow for sizing high-rise stair pressurisation, car park ventilation and tunnel ventilation. It connects airflow calculations to life safety, control, electrical supply and structural coordination, with an illustrative pressurisation example.

§ 1.0Design Objective & Industry Benchmarks

Ventilation must support safe evacuation and emergency response. High-rise stair pressurisation limits smoke entry into escape stairs. Car park ventilation controls vehicle pollutants during normal operation and removes smoke during a fire. Tunnel ventilation manages smoke movement and supports evacuation and incident response.

Benchmarks depend on building use, geometry, climate, traffic and the fire strategy. Use the National Building Code of India 2016 (NBC 2016) for applicable building requirements. Use NFPA 502, Standard for Road Tunnels, Bridges, and Other Limited Access Highways, for applicable tunnel requirements. Confirm the adopted editions and local authority requirements at project start.

Do not use one airflow benchmark for every site. Set project criteria for pressure, airflow, pollutant levels, smoke control, operating modes and system availability. Confirm each value against the governing code and approved fire strategy.

§ 2.0Step-by-Step Sizing Methodology

  • Define the design cases. Record normal operation, fire operation, evacuation routes, door positions, traffic conditions and required system modes. Identify the spaces each fan serves.
  • Set measurable criteria. For stairs, establish the required pressure difference and airflow through open doors. For car parks, establish pollutant limits and fire-mode objectives. For tunnels, define the design fire, smoke-control strategy and required airflow direction.
  • Calculate stair pressurisation airflow. List leakage paths, such as closed doors and shafts. Estimate leakage area for each path. For an opening, use Q = Cd A √(2ΔP/ρ). Q is airflow in cubic metres per second (m³/s); Cd is the discharge coefficient; A is opening area in square metres (m²); ΔP is pressure difference in pascals (Pa); and ρ is air density in kilograms per cubic metre (kg/m³). Add leakage flows and the airflow needed at the specified open-door condition. The total sets the initial fan duty.
  • Size car park ventilation. Determine airflow from the selected pollutant-control method. For a specified air-change rate, use Q = nV/3600. Q is in m³/s, n is air changes per hour, and V is volume in m³. Where required, assess carbon monoxide and nitrogen dioxide levels using traffic and emission inputs. Check normal and fire modes separately.
  • Size tunnel ventilation. Establish the design fire and calculate the required smoke-control airflow using the approved tunnel method. For longitudinal systems, assess critical velocity: the airflow speed needed to limit smoke movement against the ventilation flow. Include tunnel area, gradient, fire heat release and operating conditions. Verify fan thrust, pressure losses and equipment temperature ratings.
  • Select and verify equipment. Calculate duct, shaft and network losses. Check fan duty at the required flow and pressure, then assess controls and emergency power. Verify performance for each required operating mode.

§ 3.0Practical Worked Example

Consider an illustrative stair with a closed-door leakage area of 0.08 m². Assume Cd = 0.65, air density ρ = 1.2 kg/m³ and a project pressure target ΔP = 40 Pa. These are example inputs, not universal criteria.

Leakage airflow is Q = 0.65 × 0.08 × √(2 × 40 / 1.2), or about 0.34 m³/s. Suppose the approved open-door test requires 1.8 m³/s to maintain outward airflow. Add the two duties: 0.34 + 1.8 = 2.14 m³/s. A preliminary 10% allowance gives about 2.35 m³/s. The fan selection still needs network calculations and pressure-control checks. Confirm the pressure and open-door criteria against NBC 2016, the fire strategy and authority approval.

§ 4.0Cross-Trade MEP Coordination

Agree shaft and plant-room space with architects and structural engineers early. Coordinate openings, supports, vibration loads and tunnel equipment clearances with structure. Electrical engineers must confirm emergency power, starting current and control wiring. Fire engineers must align fan modes with alarms, dampers, doors and evacuation plans. Coordinate controls with building management systems, while keeping life-safety functions independent where required.

§ 5.0Applicable Standards & Codes

Apply NBC 2016 to relevant Indian building and fire-safety provisions. Apply NFPA 502 to relevant road tunnels and limited-access highways. Use the project’s adopted fire strategy, authority requirements and applicable mechanical, electrical and fire codes alongside them. Verify editions and local amendments; do not assume one standard replaces another.

§ 6.0Core Rules of Thumb for Practice

  • Rule of thumb: Add leakage paths separately before selecting a pressurisation fan.
  • Rule of thumb: Check closed-door pressure and open-door airflow as distinct conditions.
  • Rule of thumb: Keep car park normal ventilation separate from fire-mode design checks.
  • Rule of thumb: Base tunnel smoke ventilation on the design fire, not a generic air-change rate.
  • Treat every rule of thumb as a starting point. Verify project criteria, calculations and approvals.

References

  1. NBC 2016
  2. NFPA 502
HVACventilationpressurisationtunnels

This article is AI-generated and developed using validated and authenticated engineering standards, principles, and technical references.